The Art of Lean on Waste & Work, Part 7: Defects


Though he’s calling the waste of defects the sixth waste in this series, Art Smalley, president of Art of Lean, Incorporated, says you should consider it the first–or worst–form of waste in some situations. Learn when and why. Part seven of eight. Watch the others:
– Part one: A Focus on Muda: https://www.lean.org/LeanPost/Posting.cfm?LeanPostId=1281
– Part two: Overproduction: https://www.lean.org/LeanPost/Posting.cfm?LeanPostId=1288
– Part three: Excess Inventory: https://www.lean.org/LeanPost/Posting.cfm?LeanPostId=1293
– Part four: Excess Conveyance: https://www.lean.org/LeanPost/Posting.cfm?LeanPostId=1297
– Part five: https://www.youtube.com/watch?v=voa8bMhTSOU
– Part six: https://www.lean.org/LeanPost/Posting.cfm?LeanPostId=1306

You May Also Like